Products Description
|
Product name |
control valve assy |
|
Part number |
4366958 4194447 4330216 |
|
Excavator model |
EX120-5 |
|
Lead time |
1-3 days after payment |
|
Packing |
neutral/original |
|
MOQ |
1 PC |
|
Quality |
high quality |
|
Warranty |
3-6 months |
|
Shipping |
DHL, UPS, FedEx, Air, Sea, DDP |
|
Payment |
TT/Alibaba Trade Assurance/Credit card/Western Union/Alipay/Wechat |
DETAILED PHOTOS






Core parameters and compatibility
Core Model: This main control valve assembly has several corresponding part numbers, such as 4194447, 4330216, and 4366958. Different part numbers often indicate different production batches or minor configuration differences, but all are compatible with the EX120-5 model. Some part numbers are also compatible with similar tonnage excavators such as the Hitachi EX100-5 and EX130-5.
Structural Composition: Internally, it includes a valve body shell, multiple valve cores, seals, springs, valve seats, and other key components. For example, the main control valve assembly with part number 4194447 comes with 10 valve cores and corresponding seals, springs, end caps, and other accessories to ensure precise switching of the hydraulic circuit.

Shipping Methods
- By express: DHL,UPS,FedEx,Aramex,TNT,EMS,SF express.
- By air to the airport.
- By sea to the port.
- DDP by air or by sea
- To your freight forwarder in China.

FAQ
Q:How to check for leaks and pressure?
A:Inspect the valve body flange joints, oil pipe interfaces, and seals for any oil leaks. If leaks are found, tighten the joints or replace the damaged seals immediately. Use a pressure gauge to check the system pressure and confirm that the pressure value meets the EX120-5 hydraulic system standard. Check whether the pressure regulation of components such as the relief valve and pressure compensation valve is normal.
Q:How to control flow and pressure?
A:It can adjust the flow rate of hydraulic oil delivered to various hydraulic actuators (such as hydraulic cylinders and hydraulic motors) to control the action speed; it also has a pressure regulation function to ensure that the hydraulic system operates within a safe pressure range and avoid damage to pipelines or components due to excessive pressure.
Q:How to control action switching?
A:By controlling the movement of different valve cores, different actions such as bucket, boom, swing, and travel can be switched. Some versions also support pilot control, which uses a small hydraulic circuit to drive the main valve to make the operation more precise and labor-saving.
Q:How do we prepare the machine and the environment?
A:Park the excavator on a level surface, ensuring the bucket, boom, and other working devices are smoothly placed on the ground to prevent the machine from swaying. Release any residual pressure in the hydraulic system, which can be achieved by repeatedly operating the various control levers; if disassembly and assembly takes a long time, it is recommended to drain the hydraulic oil from the tank and store it in a sealed container. Additionally, clean the installation area of dust and oil to prevent impurities from entering the hydraulic circuit.
Q:What are the symptoms of the malfunction?
A:When the control valve is working, it may emit a metallic knocking sound, a buzzing sound, or be accompanied by valve body vibration, which will intensify as the load increases.
Small Tips
control valve core assembly operation
Valve body positioning and placement
Using lifting tools, slowly place the main control valve assembly onto the mounting base, taking care to avoid collisions between the valve body and surrounding pipes and components. Adjust the valve body position so that the mounting hole is precisely aligned with the base hole; do not force alignment to avoid damaging the threaded hole or the valve body.
01
Fixed valve body bolts
Apply a suitable amount of locking adhesive to the bolt threads, insert the bolts into the mounting holes one by one, and manually pre-tighten them. Use a torque wrench to gradually tighten the bolts in a diagonal sequence, referring to the tightening standard of the main control valve of the same tonnage excavator. The torque should generally be controlled within a suitable range (avoiding excessive looseness leading to leakage or excessive tightness leading to valve body deformation).
02
Connect hydraulic lines
Connect the hydraulic hoses to the valve body ports one by one according to the previously marked correspondences. During connection, check the hose interfaces for deformation. Install appropriate gaskets at the interfaces, manually tighten the joints, and then use a wrench to tighten them appropriately. Do not forcefully tighten to prevent cracking of the hose interfaces. Pay special attention to distinguishing between the inlet port (P port) and the return port (T port); do not connect them in reverse.
03
Assemble auxiliary components
If the main control valve includes a pilot control mechanism, pressure sensor, and other auxiliary components, install them in sequence and connect the wiring interfaces. Ensure that the sensor, valve core, and other components are installed in the correct orientation and that the wiring plugs are securely inserted to avoid poor contact affecting signal transmission.
04
Hot Tags: ex120-5 control valve assy 4366958 4194447 4330216, China ex120-5 control valve assy 4366958 4194447 4330216 manufacturers, suppliers, factory
