320c SWING Carrier Assy 1st 320c SWING Second Carrier Assy

320c SWING Carrier Assy 1st 320c SWING Second Carrier Assy
Details:
PART NAME:
SWING Carrier Assy 1st
SWING second carrier assy
MODEL:320 322 323 325
Send Inquiry
Add To Inquiry
Chat Now
Description
Send Inquiry

 

Products Description

 

 

Product name

SWING Carrier Assy 1st  SWING second carrier assy

Part number

320c

Excavator model

320c

Lead time

1-3 days after payment

Packing

neutral/original

MOQ

1 PC

Quality

high quality

Warranty

3-6 months

Shipping

DHL, UPS, FedEx, Air, Sea, DDP

Payment

TT/Alibaba Trade Assurance/Credit card/Western Union/Alipay/Wechat

 

DETAILED PHOTOS

 

320c -2
320c
320c -2
320c
320c
320c

 

 

320c SWING Carrier Assy 1st

320c SWING second carrier assy

 

Both assemblies are core transmission components within the swing reducer of the Caterpillar 320C excavator, and are key parts of the planetary gear transmission structure. They work together in the following power transmission sequence:

320c SWING Carrier Assy 1st: This is the first transmission component to contact after the swing motor outputs power. Its core components include the first-stage sun gear, first-stage planetary gears, and first-stage planetary cage. Its function is to receive the power output from the swing motor, initially reduce the speed and increase the torque, and then smoothly transmit the power to the swing second stage assembly.

320c SWING second carrier assy: Composed of the second-stage sun gear, second-stage planetary gears, and second-stage planetary cage, this assembly receives power from the first stage assembly, further reduces the speed and increases the torque, and then transmits the processed power to the swing bearing and the swing platform, ultimately driving the excavator's upper turntable to rotate smoothly.

 
320c

 

 

Shipping Methods
  1. By express: DHL,UPS,FedEx,Aramex,TNT,EMS,SF express.
  2. By air to the airport.
  3. By sea to the port.
  4. DDP by air or by sea
  5. To your freight forwarder in China.

 

2

 

FAQ

 

Q:Do you have your own factory or partners?

A: We operate our own factory in China and partner with top-tier suppliers for stable supply chains.

Q:How to verify part compatibility?

A:Provide your excavator model ,pictures and part number for verification.

Q:Which excavator brands are your parts compatible with?

A:Compatible with major brands like Caterpillar, Komatsu, Hitachi, Volvo, Kobelco,Doosan,etc.

Q:What shipping options are available?

A:Express (DHL/UPS/Fedex), sea freight, air freight

Q:Are products tested before shipment?

A:All products undergo 100% functionality testing before shipment to ensure they are fully functional.

 
 

Small Tips

 

 

Maintenance Item Maintenance Cycle Corresponding Maintenance Content
Oil change for swing mechanism housing Every 1000 working hours The swing first-stage and second-stage assemblies rely on gear oil for lubrication and heat dissipation. Replace the gear oil in the swing mechanism housing in accordance with the maintenance cycle of the entire machine. During oil replacement, observe the oil condition simultaneously. If metal debris is mixed in the oil, it may indicate gear wear in the two-stage assembly, and internal parts of the assembly need to be disassembled and inspected.
Lubricating grease filling for swing pinion Every 500 working hours During maintenance, check the lubricating grease level of the swing pinion and replenish it if necessary. The swing pinion is closely connected with the transmission of the two-stage swing assembly. Insufficient lubricating grease will indirectly aggravate the gear meshing wear of the assembly. This step can ensure a stable transmission environment for the two-stage assembly.
Swing bearing lubrication Every 250 working hours During maintenance, lubricate the two lubrication points of the swing bearing. The swing bearing and the two-stage swing assembly together form the swing transmission system. Proper lubrication can reduce the resistance during the swing of the entire machine and avoid damage to the two-stage assembly due to excessive transmission load.
Condition inspection of swing gears Every 2000 working hours Open the inspection cover to check whether the lubricating grease at the swing gears is contaminated or mixed with water, and conduct a linked inspection of the sealing condition of the swing first-stage and second-stage assemblies. If the lubricating grease deteriorates or gets water, it is highly probable that the sealing parts of the assembly are aged. Replace the sealing parts in a timely manner to prevent impurities from entering the assembly and causing gear wear.
Daily appearance and operation inspection Before each startup / after operation Visually inspect the swing part for oil leakage traces, and pay attention to whether there is jamming or abnormal noise during the swing operation. If abnormalities occur, it may be caused by poor gear meshing, planet carrier deformation and other problems of the swing first-stage or second-stage assembly. Stop the machine immediately for troubleshooting to prevent the expansion of faults.

 

 

 

 

 

Hot Tags: 320c swing carrier assy 1st 320c swing second carrier assy, China 320c swing carrier assy 1st 320c swing second carrier assy manufacturers, suppliers, factory

Send Inquiry